What is a Turnkey Project? Correct Definition and Critical Details

2 min read ... Views

One of the most frequently encountered definitions when constructing conference, theater and cinema halls is "turnkey project". However, this expression is used in many different ways in the field and is often applied incompletely or incorrectly. This concept, which can lead to serious cost and quality losses for the investor, must be understood correctly. We explain with concrete headings what to pay attention to.


What is a Turnkey Project? It is a model in which the entire work is planned, managed and delivered ready for use by a single contractor, without the need for the intervention of the employer. covers:

– Architectural and static projecting

– Electrical and mechanical infrastructure systems

– Acoustics arrangement

– Stage and lighting systems

– Floor, wall and ceiling coverings

– Seating systems (seats)

– Automation and control systems

– Fire safety, ventilation and emergency exit Infrastructures It does not count. It can present the works it undertakes as “turnkey”. This is wrong both technically and ethically. The feature of a real turnkey project is that all processes are managed from a single center and implemented with holistic coordination.


Turnkey Model Advantages


1. Time Management: Since all work is planned synchronously, delivery time is shortened.


2. Integrity in Design: It is ensured that the wall covering, ceiling design and seats are harmonized with the same aesthetic understanding.


3. Cost Discipline: There are no separate price surprises for different items. Budget control determined at the beginning It is kept under.


4. Warranty and Liability: A single company is responsible for the entire structure. It is not necessary to call a separate company for each malfunction or revision request.


Which Questions Should Be Asked?

Before starting a project, the contractor The following questions should be asked clearly to the company:


– Are all sub-work items your responsibility, or do you work with subcontractors?

– Project To what extent are the drawings integrated into the site during application?

– Are the scope of delivery and warranty conditions clearly defined in the contract?

– The materials used are certified and long-lasting ?

– Will acoustic performance and fire safety tests be carried out? Approach

In our approach, turnkey is not just a marketing term, but the gathering of engineering, logistics and field management disciplines in one hand. In this way, the investor is relieved of both technical and operational burden; At the end of the work, he receives not only the key to the hall, but also a full confidence. It offers great advantages in terms of time, cost and quality. However, the incomplete services provided under this model expose employers to serious risks. Investors; Being conscious of the contract, project scope and site control directly affects the success of the project. has been prepared.

🔍 All content is under copyright protection and is regularly monitored digitally.

💡 Individuals or institutions who want to use the content should contact us. is mandatory.

⚠️ If unauthorized use is detected, legal action will be initiated without delay. Engineering LTD ŞTİ

AI
Nish AI Asistan
Cevrimici
Merhaba! 👋 Ben Nish Global'in yapay zeka asistanıyım. Nasıl yardımcı olabilirim?