Technical

Most Common Mistakes in Conference Hall Construction

2 min read ... Views

Warnings and Correct Application Recommendations from Experts


Many institutions that want to have a conference hall built, the process is only for seating. and thinks it's just stage setting. However, this job requires professional planning and engineering discipline.

In this article, we explain the mistakes we frequently encounter in the field and how to avoid these mistakes. We share. Arbitrary Selection of Area

Common mistake: Preferring areas with insufficient ceiling height or structures divided by columns.

Right approach: The area where the hall will be built has a ceiling height of at least 3.5 meters, is column-free and symmetrical. should be.

---


2. The Floor Step System Is Ignored mistake: The seats are placed on the flat ground and the viewing angle is completely neglected.

Correct approach: The floor step system for the seats should be calculated specifically for the project and the heights should be in the correct proportion. should be planned.

---


3. Neglecting Acoustic Calculations cannot be used.

Common mistake: Focusing only on aesthetic wall coverings, making coatings without measuring the echo time.

Right approach: Acoustic panels on ceilings and walls according to the echo time. should be placed.

Good acoustics doubles the quality of the hall. It increases. Not Selection of Seats Appropriately


Seats are the most basic elements of the hall.

Common mistake: Only Preferring uncomfortable, thin sponge, low density seats because the price is affordable.

Right approach: The appropriate model should be chosen according to the period of use and the target audience, and a sponge with a density of at least 55 density should be used. should not show.

---


5. Deciding on Sound and Lighting Systems at the Last Minute

In this case, additional costs and deteriorated aesthetics are inevitable because the cable infrastructure is not prepared.

Right approach: Sound, light and imaging systems should be included in the design at the very beginning of the project, cable ducts and device placements must be made in advance. should be planned.

---


6. Giving the Entire Process to Different Companies


Giving each job to different companies causes loss of time, coordination problems and quality confusion.

Frequently. Mistake made: The seat is bought from another place, the floor from another place, the sound system from another place.

Right approach: The whole process should be carried out on a turnkey basis by a single engineering company.

In this way, time is saved, costs are kept under control and professional coordination is achieved. It is provided. Lack of Proper Discovery and Project Design


Common mistake: Starting the application without making a project. This often results in puzzle-like feedback.

Right approach: Before the application begins, on-site exploration should be done, measurements should be taken and the process should be managed with technical drawings.

As Nish Global, in every project, first on-site exploration, then a three-dimensional layout plan and detailed offer. We offer.

---


CONCLUSION


Conference Small mistakes made during the installation of the living room can turn into big problems that are difficult to reverse later. It provides You can benefit from the project planning service.


Correct planning, solid implementation, long-lasting results.

This is our job. this.


📄 Content Information

The information on this page is provided by Nish Global. has been prepared.

🔍 All content is under copyright protection and is regularly monitored digitally.

💡 Individuals or institutions who want to use the content should contact us. is mandatory.

⚠️ If unauthorized use is detected, legal action will be initiated without delay. Engineering LTD ŞTİ

AI
Nish AI Asistan
Cevrimici
Merhaba! 👋 Ben Nish Global'in yapay zeka asistanıyım. Nasıl yardımcı olabilirim?