⏱️ Process Management in Hall Construction: How Long Does It Take From Start to Finish?
You want to build a new conference hall, theatre, cinema or multi-purpose hall…
But the first question in your mind is is:
"How will the process proceed after I place the order? When will I receive it?"
The answer to this very question, Nish Global with his expertise, simply and clearly We are telling.
---
🧭 1. Discovery and Needs Analysis (1-3 Days)
Before starting the work, we examine the area where the project will be carried out.
At this stage: clarified:
✔️ How many people will the capacity be?
✔️ Will there be a stage, just the seating area ?
✔️ What are your acoustic expectations? create.
🖥️ 2. Design and Technical Planning (3-7 Days)
Architectural drawings, seating plans, 3D visuals are prepared.
At this stage, color selection, material type and modular details become clear.
📌 We will not start production without your approval. Everything is available to you digitally income.
--
🏗️ 3. Production process (15-30 days) It is produced.
Fabrication time varies depending on the size of the order, but on average it takes 3-4 weeks. you We inform you.
---
🚚 4. Transportation and Assembly (3-10 Days) begins.
Floor, wall, ceiling systems The process is completed with installation, seat assembly and final tests. can show.
< span>---
✅ General Average Time: Between 30 - 45 Days
Yes, it takes approximately 1 - 1.5 months to deliver a hall from scratch.
But This period can be flexible depending on the project size, special demands and geographical conditions. is managed.
💬 Nish Global Difference:
📍 All processes are managed from a single center.
📍 Every step is written to you in writing. is reported.
📍 Professional time planning that eliminates the risk of delays is applied.
🛑 This article was prepared by Nish Global. It cannot be copied without permission.
📩 Contact us for the duration and budget of your project!